Solar PV

Summary

ONE-STOP TOTAL PV SOLUTION SYSTEM

Won Kwang S&T's abundant construction technology know-how, which has grown steadily based on trust and honesty, provides a one-stop EPC solution that includes the most efficient and optimized PV system design for the project site, development approval, responsible construction, and maintenance to ensure quality satisfaction after completion. We will do our best to meet the needs and satisfaction of business owners by providing a possible total PV solution system and become a reliable business partner whom they can trust.

What is PV business?

The PV business is a part of the renewable energy business in which individual or corporate operators construct photovoltaic power generation facilities on land, forests, and buildings, and the electricity produced through this is contracted with the Korea Electric Power Corporation (Power Purchase Agreement). Monthly weighted average system marginal price (SMP:System Marginal Price) transaction through a purchase agreement or real-time SMP transaction through the Korea Power Exchange and a new and renewable energy supply certificate (REC: Renewable Energy Cerificate) issued based on accumulated power generation. This is a renewable energy power generation business that generates profits by selling certificates to power generation companies (27 power generation companies) with mandatory supply.

RPS(Renewable Portfolio Standards) policy

  • A system that obliges power generation business operators (supply obligors) with power generation facilities of a certain size (500 MW) or more to supply more than a certain percentage of the total power generation using renewable energy
  • Supply obligors : total 27 power generation company

Basis for implementation

Mandatory Renewable Energy Supply System (RPS): Implemented on January 1, 2012

  • 1. Article 12-5
  • 2.Ministry of Trade, Industry and Energy Notice
  • 3.Renewable Energy Center Rules
Supply obligors (27 power generation companies)

Korea Electric Power Corporation (KEPCO) power generation subsidiaries (6 companies)

Korea Hydro & Nuclear Power, South-East Power, Korea Midland Power, Korea Southern Power, Western Power, East-West Power

Public institutions (2 companies)

Korea District Heating Corporation, K-Water

Private power generation business operators (19 companies)

SK E&S, GS EPS, GS Power, POSCO International, MPC Yulchon Power, Pyeongtaek Energy Service, Daeryun Power, S-Power, Pocheon Power, Dongducheon Dream Power, Paju Energy Service, GS Donghae Power, Pocheon Independent Power Generation, Shinpyeongtaek Power, Narae Energy, Goseong Green Power, Gangneung Eco Power, Yeoju Energy Service, Samcheok Blue Power

REC sales contract
  • Contract period: 20 years (in case of a fixed price contract, the unit price is fixed for 20 years, and the contract can be extended after contract expiration)
  • RPS Bidding Schedule: Twice a year in April and October
  • Generate profit through spot trading in the Korea Power Exchange REC trading system twice a week when the fixed price contract bid fails

Annual mandatory photovoltaic power supply ratio

Annex 3 of the Enforcement Decree of the New Energy and Renewable Energy Development, Utilization, Distribution and Promotion Act

Year ‘18 ‘19 ‘20 ‘21 ‘22 ‘23 ‘24 ‘25 ‘26 ‘27 ‘28 ‘29 After 30years
Ratio (%) 5.0 6.0 7.0 9.0 12.5 13.0 13.5 14.0 15.0 17.0 19.0 22.5 25.0

※Annually total obligatory supply = total power generation (previous year/excluding renewable energy) *obligatory ratio (%)

  • Contract period: 20 years (in the case of a fixed price contract, the unit price is fixed for 20 years, and the contract can be extended after contract expiration)
  • RPS Bidding Schedule: Twice a year in April and October
  • In case of failure in fixed price contract bidding, profit generation through spot trading in the Korea Power Exchange REC trading system twice a week

The profits from PV power generation consist of two types: electricity sales revenue (SMP: system marginal price) with KEPCO and REC (supply certificate) sales revenue with the supply obligor.

SMP

System Marginal Price : Payment of System Margin Price

Contract subject : Korea Electric Power Corporation or Korea Power Exchange

REC

Renewable Energy Certificate : supply certificate

Definition : Certificate for confirmation that energy has been supplied using renewable energy

Issuer : Korea Energy Management Corporation New and Renewable Energy Center

Contract target : 27 supply obligations

REC weighted value

REC(supply certificate) weighted value according to installed capacity (0.7~1.5)

Profit formula: SMP + (REC x weighted value) = Unit price per bill

PV power supply certificate weighted value

Item Supply certificate weighted value Target energy and standards
Installation type Detailed standards
PV energy 1.2 When installing on a general site Below 100kW
1.0 From 100kW
0.8 Exceeding 3,000kW
0.5 When installing in a forest -
1.5 When using existing facilities such as buildings Below 3,000kW
1.0 Exceeding 3,000kW
1.6 When installing while floating on the water surface of a reservoir, etc. Below 100kW
1.4 From 100kW
1.2 Exceeding 3,000kW
1.0 When trading electricity through private power generation facilities -
  • The weighted values are determined and announced by the Minister of Trade, Industry and Energy, taking into account the impact on the environment, technology development and industrial revitalization, power generation costs, existing potential, and the effect on reducing greenhouse gas emissions.
  • Supply certificate weighted values are reexamined every three years (if necessary, the reexamination period can be shortened)

Photovoltaic(PV) project progress procedure

01

Selection of business site

Check the area where permits are available

Check KEPCO-connected capacity

Check installation capacity

02

Power generation business permit

Ministry of Trade, Industry and Energy: 3,000kW or more

Provincial/City/County Office: Less than 3,000kW

Takes about 60days after receiving application

(※Depends on local governments)

03

Business registration

Registration at competent tax office

Takes 7days after registration

04

Permission for development activities

Application for permission from city/county/district office
More than 15 days after receipt
(Environmental impact assessment according to land area, etc. additional license required)

05

Apply for power supply contract

On-site confirmation

Determination of entry point (confirmation before power generation permit)

Notify construction cost to KEPCO

Make payment for incoming construction costs

06

Construction plan report

Check with the relevant local government

Select an electrical supervisor(Design supervision fee will occur)

07

PV installation

Civil engineering work

Structure construction

Electrical work

KEPCO Inlet Construction

08

Inspection before use

Korea Electrical Safety Corporation reception and inspection

09

Power supply contract

KEPCO SMP monthly sales

Mandatory power generation company REC purchase contract (if conditions apply)

10

Report on commencement of commercial operation

Report relevant local government documents

Completion of development activities

11

Check Installation

Application for installation confirmation for RPS (submission of development completion documents)

Korea Energy Agency installation confirmation

Sign up for Korea Power Exchange membership

12

Commencement of commercial operation

Meter sealing and solar power generation commencement

13

Sales of REC

Power Exchange spot trading (Each Tuesday, Thursday)

RPS fixed price contract competitive bidding(April, October)

14

Issuing REC

Issuing Renewable Energy Center Public Certificate (REC)

Won Kwang S&T handles all procedures from A to Z of photovoltaic business in one stop.

  • Depending on the business site, a preliminary environmental impact assessment may be conducted in accordance with local government ordinances.